Procedure descriptions

Apply for planning permission using the simplified procedure

If you apply for planning permission using the simplified procedure, you will receive authorisation faster and more cost-effectively.

The competent authority checks less than in other procedures.

As the building owner, you are responsible for ensuring that the public lawn Regulations that apply in thennot be examined in the standardised building permit procedureebe complied with. In individual cases, you must apply for a deviationsor exemption from these Regulations. In the event of a violation, the building authority can stop the construction or have what has already been built demolished. The building permit applied foreauthorisation can be revoked due to arbreach of requirements that are not subject to the simplified procedurerthe simplified procedure.

The building permit expires automaticallyif you do notrwithin three years of the authorisation being granted or if the construction work begins after the authorisation has been grantedeperiod has been interrupted for one year. Thisthese Three-yearsperiod can be extended.

Responsible department

the lower building authority

Depending on the location of the building project, the lower building authority is

  • the municipal/city administration or
  • the district office.

Details

Prerequisite

The simplified building permit procedure is available for building projects that are not special buildings and for which the notification procedure has not been opened or is not desired by the client. In detail:

    • Residential buildings,
    • free-standing buildings with a height of up to 7 m and no more than two utilisation units of no more than 400 m² in total (building class 1 according to the state building regulations), excluding restaurants
    • free-standing buildings used for agriculture or forestry (building class 1 according to the state building regulations)
    • Buildings with a height of up to 7 m and no more than two utilisation units totalling no more than 400 m² (building class 2 according to the state building regulations), excluding restaurants
    • other buildings with a height of up to 7 metres (building class 3 according to the state building regulations), excluding restaurants
    • other structures that are not buildings
    • Outbuildings and ancillary facilities for the aforementioned projects, such as garages

and

  • You do not want to or cannot carry out a notification procedure because you want to erect the building project outside the scope of a development plan or want to deviate from regulations.
  • It is not a special building such as a tower block or hospital. For example, a tower block or hospital.

Procedure

The building application with all the necessary building documents and the completed survey form for the statistics on construction activity is submitted electronically by the building owner to the responsible building authority via the online service provided by the authority (in of the rule ViBa-BW). Deviations, exceptions and exemptions must be applied for separately.

The building authority checks within ten working days whether the building documents are complete and which other offices and departments need to be involved in the process. If the building documents are incomplete, the building authority will advise which additions are required. As soon as the building application and the building documents are complete, the expected date of the decision is communicated.

The building authority examines the building application exclusively with regard to

  • the admissibility under building planning law
  • compliance with the distance regulations
  • compliance with other public law regulations outside of building law, insofar as these impose requirements for a building permit or the project is located in an outdoor area.

It consults the municipality, if it is not itself the building authority, and those bodies whose area of responsibility is affected. This is, for example, the monument protection authority if it is a cultural monument or the project has an impact on a neighbouring registered cultural monument.

If deviations, exceptions or exemptions are applied for that also serve to protect the neighbour, the municipality will notify the owners of the properties adjacent to the building plot (adjoining owners) within five working days of receiving the complete building documents at the instigation of the building authority. This gives them the opportunity to raise objections to the building project within four weeks.

Once all comments have been received and the building application has been reviewed, the decision is made: The building permit is granted, granted only with certain conditions and requirements or the building application is rejected.

Construction of the project may only begin once the building permit has been granted and the building permit, the so-called "red dot", has been issued.

A building inspection under public law only takes place if the building authority has expressly ordered this.

Note: Firing systems may only be put into operation once the authorised district chimney sweep has certified that they are fire-safe and that the combustion gases are safely discharged.

Deadlines

none

Required documents

 

  • Site plan
  • Construction drawings
  • Building description
  • Representation of the site drainage *
  • Declaration on the proof of stability
  • Name and address of the site manager, if one has been appointed *
  • Survey form for the statistics on building construction activity
  • technical information on firing systems

The building documents marked with * can be submitted later. If necessary, the building authority can request further documents in individual cases or dispense with individual building documents. The documents must be submitted in archivable Portable Document Format (pdf/A) via the transmission channel specified by the building authority.

Costs

The costs are based on the rates specified in the respective statutes or legal ordinances.

Processing time

Depends on your individual case and, above all, which authorities need to be involved. The procedure usually takes between one month and four months.

Miscellaneous

If you have any questions, please contact your architect, your housing association or the responsible office.

Legal basis

Landesbauordnung (LBO):

  • § 2 Begriffe
  • § 43 Entwurfsverfasser
  • § 52 Vereinfachtes Baugenehmigungsverfahren
  • § 53 Bauvorlagen und Bauantrag
  • § 55 Benachrichtigung der Nachbarn und Beteiligung der Öffentlichkeit
  • § 58 Baugenehmigung
  • § 59 Baubeginn
  • § 67 Bauabnahme, Inbetriebnahme der Feuerungsanlage)

Verordnung der Landesregierung, des Ministeriums für Landesentwicklung und Wohnen über das baurechtliche Verfahen (Verfahrensverordnung zur Landesbauordnung - LBOVVO):

  • § 2 Bauvorlagen in Genehmigungsverfahren

Release note

Machine generated, based on the German release by: Ministerium für Landesentwicklung und Wohnen Baden-Württemberg, 03.04.2025

Kontakt

Gemeindeverwaltung Ketsch
Hockenheimer Straße 5
68775 Ketsch

Telefon:
06202/606-0 (Zentrale)

Fax:
06202/606-116

E-Mail allgemein:
info-ketsch@ketsch.de

E-Mail Homepage:
redaktion-homepage@ketsch.de